---
last-redoc-date: 2025-11-05
---
# Test Architect (TEA) Agent Guide
## Overview
- **Persona:** Murat, Master Test Architect and Quality Advisor focused on risk-based testing, fixture architecture, ATDD, and CI/CD governance.
- **Mission:** Deliver actionable quality strategies, automation coverage, and gate decisions that scale with project complexity and compliance demands.
- **Use When:** BMad Method or Enterprise track projects, integration risk is non-trivial, brownfield regression risk exists, or compliance/NFR evidence is required. (Quick Flow projects typically don't require TEA)
## TEA Workflow Lifecycle
TEA integrates into the BMad development lifecycle during Solutioning (Phase 3) and Implementation (Phase 4):
```mermaid
%%{init: {'theme':'base', 'themeVariables': { 'primaryColor':'#fff','primaryTextColor':'#000','primaryBorderColor':'#000','lineColor':'#000','secondaryColor':'#fff','tertiaryColor':'#fff','fontSize':'16px','fontFamily':'arial'}}}%%
graph TB
subgraph Phase2["Phase 2: PLANNING"]
PM["PM: *prd (creates PRD + epics)"]
PlanNote["Business requirements phase"]
PM -.-> PlanNote
end
subgraph Phase3["Phase 3: SOLUTIONING"]
Architecture["Architect: *architecture"]
Framework["TEA: *framework"]
CI["TEA: *ci"]
GateCheck["Architect: *solutioning-gate-check"]
Architecture --> Framework
Framework --> CI
CI --> GateCheck
Phase3Note["Test infrastructure AFTER architecture
defines technology stack"]
Framework -.-> Phase3Note
end
subgraph Phase4["Phase 4: IMPLEMENTATION - Per Epic Cycle"]
SprintPlan["SM: *sprint-planning"]
TestDesign["TEA: *test-design (per epic)"]
CreateStory["SM: *create-story"]
ATDD["TEA: *atdd (optional, before dev)"]
DevImpl["DEV: implements story"]
Automate["TEA: *automate"]
TestReview1["TEA: *test-review (optional)"]
Trace1["TEA: *trace (refresh coverage)"]
SprintPlan --> TestDesign
TestDesign --> CreateStory
CreateStory --> ATDD
ATDD --> DevImpl
DevImpl --> Automate
Automate --> TestReview1
TestReview1 --> Trace1
Trace1 -.->|next story| CreateStory
TestDesignNote["Test design: 'How do I test THIS epic?'
Creates test-design-epic-N.md per epic"]
TestDesign -.-> TestDesignNote
end
subgraph Gate["EPIC/RELEASE GATE"]
NFR["TEA: *nfr-assess (if not done earlier)"]
TestReview2["TEA: *test-review (final audit, optional)"]
TraceGate["TEA: *trace - Phase 2: Gate"]
GateDecision{"Gate Decision"}
NFR --> TestReview2
TestReview2 --> TraceGate
TraceGate --> GateDecision
GateDecision -->|PASS| Pass["PASS ✅"]
GateDecision -->|CONCERNS| Concerns["CONCERNS ⚠️"]
GateDecision -->|FAIL| Fail["FAIL ❌"]
GateDecision -->|WAIVED| Waived["WAIVED ⏭️"]
end
Phase2 --> Phase3
Phase3 --> Phase4
Phase4 --> Gate
style Phase2 fill:#bbdefb,stroke:#0d47a1,stroke-width:3px,color:#000
style Phase3 fill:#c8e6c9,stroke:#2e7d32,stroke-width:3px,color:#000
style Phase4 fill:#e1bee7,stroke:#4a148c,stroke-width:3px,color:#000
style Gate fill:#ffe082,stroke:#f57c00,stroke-width:3px,color:#000
style Pass fill:#4caf50,stroke:#1b5e20,stroke-width:3px,color:#000
style Concerns fill:#ffc107,stroke:#f57f17,stroke-width:3px,color:#000
style Fail fill:#f44336,stroke:#b71c1c,stroke-width:3px,color:#000
style Waived fill:#9c27b0,stroke:#4a148c,stroke-width:3px,color:#000
```
**Phase Numbering Note:** BMad uses a 4-phase methodology with optional Phase 0/1:
- **Phase 0** (Optional): Documentation (brownfield prerequisite - `*document-project`)
- **Phase 1** (Optional): Discovery/Analysis (`*brainstorm`, `*research`, `*product-brief`)
- **Phase 2** (Required): Planning (`*prd` creates PRD + epics)
- **Phase 3** (Track-dependent): Solutioning (`*architecture` → TEA: `*framework`, `*ci` → `*solutioning-gate-check`)
- **Phase 4** (Required): Implementation (`*sprint-planning` → per-epic: `*test-design` → per-story: dev workflows)
**TEA workflows:** `*framework` and `*ci` run once in Phase 3 after architecture. `*test-design` runs per-epic in Phase 4. Output: `test-design-epic-N.md`.
Quick Flow track skips Phases 0, 1, and 3. BMad Method and Enterprise use all phases based on project needs.
### Why TEA is Different from Other BMM Agents
TEA is the only BMM agent that operates in **multiple phases** (Phase 3 and Phase 4) and has its own **knowledge base architecture**.
Cross-Phase Operation & Unique Architecture
### Phase-Specific Agents (Standard Pattern)
Most BMM agents work in a single phase:
- **Phase 1 (Analysis)**: Analyst agent
- **Phase 2 (Planning)**: PM agent
- **Phase 3 (Solutioning)**: Architect agent
- **Phase 4 (Implementation)**: SM, DEV agents
### TEA: Multi-Phase Quality Agent (Unique Pattern)
TEA is **the only agent that operates in multiple phases**:
```
Phase 1 (Analysis) → [TEA not typically used]
↓
Phase 2 (Planning) → [PM defines requirements - TEA not active]
↓
Phase 3 (Solutioning) → TEA: *framework, *ci (test infrastructure AFTER architecture)
↓
Phase 4 (Implementation) → TEA: *test-design (per epic: "how do I test THIS feature?")
→ TEA: *atdd, *automate, *test-review, *trace (per story)
↓
Epic/Release Gate → TEA: *nfr-assess, *trace Phase 2 (release decision)
```
### TEA's 8 Workflows Across Phases
**Standard agents**: 1-3 workflows per phase
**TEA**: 8 workflows across Phase 3, Phase 4, and Release Gate
| Phase | TEA Workflows | Frequency | Purpose |
| ----------- | ----------------------------------------------------- | ---------------- | ---------------------------------------------- |
| **Phase 2** | (none) | - | Planning phase - PM defines requirements |
| **Phase 3** | *framework, *ci | Once per project | Setup test infrastructure AFTER architecture |
| **Phase 4** | *test-design, *atdd, *automate, *test-review, \*trace | Per epic/story | Test planning per epic, then per-story testing |
| **Release** | *nfr-assess, *trace (Phase 2: gate) | Per epic/release | Go/no-go decision |
**Note**: `*trace` is a two-phase workflow: Phase 1 (traceability) + Phase 2 (gate decision). This reduces cognitive load while maintaining natural workflow.
### Unique Directory Architecture
TEA is the only BMM agent with its own top-level module directory (`bmm/testarch/`):
```
src/modules/bmm/
├── agents/
│ └── tea.agent.yaml # Agent definition (standard location)
├── workflows/
│ └── testarch/ # TEA workflows (standard location)
└── testarch/ # Knowledge base (UNIQUE!)
├── knowledge/ # 21 production-ready test pattern fragments
├── tea-index.csv # Centralized knowledge lookup (21 fragments indexed)
└── README.md # This guide
```
### Why TEA Gets Special Treatment
TEA uniquely requires:
- **Extensive domain knowledge**: 21 fragments, 12,821 lines covering test patterns, CI/CD, fixtures, quality practices, healing strategies
- **Centralized reference system**: `tea-index.csv` for on-demand fragment loading during workflow execution
- **Cross-cutting concerns**: Domain-specific testing patterns (vs project-specific artifacts like PRDs/stories)
- **Optional MCP integration**: Healing, exploratory, and verification modes for enhanced testing capabilities
This architecture enables TEA to maintain consistent, production-ready testing patterns across all BMad projects while operating across multiple development phases.
## High-Level Cheat Sheets
These cheat sheets map TEA workflows to the **BMad Method and Enterprise tracks** across the **4-Phase Methodology** (Phase 1: Analysis, Phase 2: Planning, Phase 3: Solutioning, Phase 4: Implementation).
**Note:** Quick Flow projects typically don't require TEA (covered in Overview). These cheat sheets focus on BMad Method and Enterprise tracks where TEA adds value.
**Legend for Track Deltas:**
- ➕ = New workflow or phase added (doesn't exist in baseline)
- 🔄 = Modified focus (same workflow, different emphasis or purpose)
- 📦 = Additional output or archival requirement
### Greenfield - BMad Method (Simple/Standard Work)
**Planning Track:** BMad Method (PRD + Architecture)
**Use Case:** New projects with standard complexity
| Workflow Stage | Test Architect | Dev / Team | Outputs |
| -------------------------- | ----------------------------------------------------------------- | ---------------------------------------------------- | ---------------------------------------------------------- |
| **Phase 1**: Discovery | - | Analyst `*product-brief` (optional) | `product-brief.md` |
| **Phase 2**: Planning | - | PM `*prd` (creates PRD + epics) | PRD, epics |
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test scaffold, CI pipeline |
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic (per-epic test plan) | Review epic scope | `test-design-epic-N.md` with risk assessment and test plan |
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
| **Phase 4**: Story Review | Execute `*test-review` (optional), re-run `*trace` | Address recommendations, update code/tests | Quality report, refreshed coverage matrix |
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Confirm Definition of Done, share release notes | Quality audit, Gate YAML + release summary |
Execution Notes
- Run `*framework` only once per repo or when modern harness support is missing.
- **Phase 3 (Solutioning)**: After architecture is complete, run `*framework` and `*ci` to setup test infrastructure based on architectural decisions.
- **Phase 4 starts**: After solutioning is complete, sprint planning loads all epics.
- **`*test-design` runs per-epic**: At the beginning of working on each epic, run `*test-design` to create a test plan for THAT specific epic/feature. Output: `test-design-epic-N.md`.
- Use `*atdd` before coding when the team can adopt ATDD; share its checklist with the dev agent.
- Post-implementation, keep `*trace` current, expand coverage with `*automate`, optionally review test quality with `*test-review`. For release gate, run `*trace` with Phase 2 enabled to get deployment decision.
- Use `*test-review` after `*atdd` to validate generated tests, after `*automate` to ensure regression quality, or before gate for final audit.
Worked Example – “Nova CRM” Greenfield Feature
1. **Planning (Phase 2):** Analyst runs `*product-brief`; PM executes `*prd` to produce PRD and epics.
2. **Solutioning (Phase 3):** Architect completes `*architecture` for the new module; TEA sets up test infrastructure via `*framework` and `*ci` based on architectural decisions; gate check validates planning completeness.
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load all epics into sprint status.
4. **Epic 1 Planning (Phase 4):** TEA runs `*test-design` to create test plan for Epic 1, producing `test-design-epic-1.md` with risk assessment.
5. **Story Implementation (Phase 4):** For each story in Epic 1, SM generates story via `*create-story`; TEA optionally runs `*atdd`; Dev implements with guidance from failing tests.
6. **Post-Dev (Phase 4):** TEA runs `*automate`, optionally `*test-review` to audit test quality, re-runs `*trace` to refresh coverage.
7. **Release Gate:** TEA runs `*trace` with Phase 2 enabled to generate gate decision.
### Brownfield - BMad Method or Enterprise (Simple or Complex)
**Planning Tracks:** BMad Method or Enterprise Method
**Use Case:** Existing codebases - simple additions (BMad Method) or complex enterprise requirements (Enterprise Method)
**🔄 Brownfield Deltas from Greenfield:**
- ➕ Phase 0 (Documentation) - Document existing codebase if undocumented
- ➕ Phase 2: `*trace` - Baseline existing test coverage before planning
- 🔄 Phase 4: `*test-design` - Focus on regression hotspots and brownfield risks
- 🔄 Phase 4: Story Review - May include `*nfr-assess` if not done earlier
| Workflow Stage | Test Architect | Dev / Team | Outputs |
| ----------------------------- | ---------------------------------------------------------------------------- | ---------------------------------------------------- | ---------------------------------------------------------------------- |
| **Phase 0**: Documentation ➕ | - | Analyst `*document-project` (if undocumented) | Comprehensive project documentation |
| **Phase 1**: Discovery | - | Analyst/PM/Architect rerun planning workflows | Updated planning artifacts in `{output_folder}` |
| **Phase 2**: Planning | Run ➕ `*trace` (baseline coverage) | PM `*prd` (creates PRD + epics) | PRD, epics, ➕ coverage baseline |
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test framework, CI pipeline |
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint status file with all epics and stories |
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (regression hotspots) | Review epic scope and brownfield risks | `test-design-epic-N.md` with brownfield risk assessment and mitigation |
| **Phase 4**: Story Dev | (Optional) `*atdd` before dev, then `*automate` after | SM `*create-story`, DEV implements | Tests, story implementation |
| **Phase 4**: Story Review | Apply `*test-review` (optional), re-run `*trace`, ➕ `*nfr-assess` if needed | Resolve gaps, update docs/tests | Quality report, refreshed coverage matrix, NFR report |
| **Phase 4**: Release Gate | (Optional) `*test-review` for final audit, Run `*trace` (Phase 2) | Capture sign-offs, share release notes | Quality audit, Gate YAML + release summary |
Execution Notes
- Lead with `*trace` during Planning (Phase 2) to baseline existing test coverage before architecture work begins.
- **Phase 3 (Solutioning)**: After architecture is complete, run `*framework` and `*ci` to modernize test infrastructure. For brownfield, framework may need to integrate with or replace existing test setup.
- **Phase 4 starts**: After solutioning is complete and sprint planning loads all epics.
- **`*test-design` runs per-epic**: At the beginning of working on each epic, run `*test-design` to identify regression hotspots, integration risks, and mitigation strategies for THAT specific epic/feature. Output: `test-design-epic-N.md`.
- Use `*atdd` when stories benefit from ATDD; otherwise proceed to implementation and rely on post-dev automation.
- After development, expand coverage with `*automate`, optionally review test quality with `*test-review`, re-run `*trace` (Phase 2 for gate decision). Run `*nfr-assess` now if non-functional risks weren't addressed earlier.
- Use `*test-review` to validate existing brownfield tests or audit new tests before gate.
Worked Example – “Atlas Payments” Brownfield Story
1. **Planning (Phase 2):** PM executes `*prd` to update PRD and `epics.md` (Epic 1: Payment Processing); TEA runs `*trace` to baseline existing coverage.
2. **Solutioning (Phase 3):** Architect triggers `*architecture` capturing legacy payment flows and integration architecture; TEA sets up `*framework` and `*ci` based on architectural decisions; gate check validates planning.
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load Epic 1 into sprint status.
4. **Epic 1 Planning (Phase 4):** TEA runs `*test-design` for Epic 1 (Payment Processing), producing `test-design-epic-1.md` that flags settlement edge cases, regression hotspots, and mitigation plans.
5. **Story Implementation (Phase 4):** For each story in Epic 1, SM generates story via `*create-story`; TEA runs `*atdd` producing failing Playwright specs; Dev implements with guidance from tests and checklist.
6. **Post-Dev (Phase 4):** TEA applies `*automate`, optionally `*test-review` to audit test quality, re-runs `*trace` to refresh coverage.
7. **Release Gate:** TEA performs `*nfr-assess` to validate SLAs, runs `*trace` with Phase 2 enabled to generate gate decision (PASS/CONCERNS/FAIL).
### Greenfield - Enterprise Method (Enterprise/Compliance Work)
**Planning Track:** Enterprise Method (BMad Method + extended security/devops/test strategies)
**Use Case:** New enterprise projects with compliance, security, or complex regulatory requirements
**🏢 Enterprise Deltas from BMad Method:**
- ➕ Phase 1: `*research` - Domain and compliance research (recommended)
- ➕ Phase 2: `*nfr-assess` - Capture NFR requirements early (security/performance/reliability)
- 🔄 Phase 4: `*test-design` - Enterprise focus (compliance, security architecture alignment)
- 📦 Release Gate - Archive artifacts and compliance evidence for audits
| Workflow Stage | Test Architect | Dev / Team | Outputs |
| -------------------------- | ------------------------------------------------------------------------ | ---------------------------------------------------- | ------------------------------------------------------------------ |
| **Phase 1**: Discovery | - | Analyst ➕ `*research`, `*product-brief` | Domain research, compliance analysis, product brief |
| **Phase 2**: Planning | Run ➕ `*nfr-assess` | PM `*prd` (creates PRD + epics), UX `*create-design` | Enterprise PRD, epics, UX design, ➕ NFR documentation |
| **Phase 3**: Solutioning | Run `*framework`, `*ci` AFTER architecture | Architect `*architecture`, `*solutioning-gate-check` | Architecture, test framework, CI pipeline |
| **Phase 4**: Sprint Start | - | SM `*sprint-planning` | Sprint plan with all epics |
| **Phase 4**: Epic Planning | Run `*test-design` for THIS epic 🔄 (compliance focus) | Review epic scope and compliance requirements | `test-design-epic-N.md` with security/performance/compliance focus |
| **Phase 4**: Story Dev | (Optional) `*atdd`, `*automate`, `*test-review`, `*trace` per story | SM `*create-story`, DEV implements | Tests, fixtures, quality reports, coverage matrices |
| **Phase 4**: Release Gate | Final `*test-review` audit, Run `*trace` (Phase 2), 📦 archive artifacts | Capture sign-offs, 📦 compliance evidence | Quality audit, updated assessments, gate YAML, 📦 audit trail |
Execution Notes
- `*nfr-assess` runs early in Planning (Phase 2) to capture compliance, security, and performance requirements upfront.
- **Phase 3 (Solutioning)**: After architecture is complete, run `*framework` and `*ci` with enterprise-grade configurations (selective testing, burn-in jobs, caching, notifications).
- **Phase 4 starts**: After solutioning is complete and sprint planning loads all epics.
- **`*test-design` runs per-epic**: At the beginning of working on each epic, run `*test-design` to create an enterprise-focused test plan for THAT specific epic, ensuring alignment with security architecture, performance targets, and compliance requirements. Output: `test-design-epic-N.md`.
- Use `*atdd` for stories when feasible so acceptance tests can lead implementation.
- Use `*test-review` per story or sprint to maintain quality standards and ensure compliance with testing best practices.
- Prior to release, rerun coverage (`*trace`, `*automate`), perform final quality audit with `*test-review`, and formalize the decision with `*trace` Phase 2 (gate decision); archive artifacts for compliance audits.
Worked Example – “Helios Ledger” Enterprise Release
1. **Planning (Phase 2):** Analyst runs `*research` and `*product-brief`; PM completes `*prd` creating PRD and epics; TEA runs `*nfr-assess` to establish NFR targets.
2. **Solutioning (Phase 3):** Architect completes `*architecture` with enterprise considerations; TEA sets up `*framework` and `*ci` with enterprise-grade configurations based on architectural decisions; gate check validates planning completeness.
3. **Sprint Start (Phase 4):** Scrum Master runs `*sprint-planning` to load all epics into sprint status.
4. **Per-Epic (Phase 4):** For each epic, TEA runs `*test-design` to create epic-specific test plan (e.g., `test-design-epic-1.md`, `test-design-epic-2.md`) with compliance-focused risk assessment.
5. **Per-Story (Phase 4):** For each story, TEA uses `*atdd`, `*automate`, `*test-review`, and `*trace`; Dev teams iterate on the findings.
6. **Release Gate:** TEA re-checks coverage, performs final quality audit with `*test-review`, and logs the final gate decision via `*trace` Phase 2, archiving artifacts for compliance.
## Command Catalog
Optional Playwright MCP Enhancements
**Two Playwright MCP servers** (actively maintained, continuously updated):
- `playwright` - Browser automation (`npx @playwright/mcp@latest`)
- `playwright-test` - Test runner with failure analysis (`npx playwright run-test-mcp-server`)
**How MCP Enhances TEA Workflows**:
MCP provides additional capabilities on top of TEA's default AI-based approach:
1. `*test-design`:
- Default: Analysis + documentation
- **+ MCP**: Interactive UI discovery with `browser_navigate`, `browser_click`, `browser_snapshot`, behavior observation
Benefit: Discover actual functionality, edge cases, undocumented features
2. `*atdd`, `*automate`:
- Default: Infers selectors and interactions from requirements and knowledge fragments
- **+ MCP**: Generates tests **then** verifies with `generator_setup_page`, `browser_*` tools, validates against live app
Benefit: Accurate selectors from real DOM, verified behavior, refined test code
3. `*automate`:
- Default: Pattern-based fixes from error messages + knowledge fragments
- **+ MCP**: Pattern fixes **enhanced with** `browser_snapshot`, `browser_console_messages`, `browser_network_requests`, `browser_generate_locator`
Benefit: Visual failure context, live DOM inspection, root cause discovery
**Config example**:
```json
{
"mcpServers": {
"playwright": {
"command": "npx",
"args": ["@playwright/mcp@latest"]
},
"playwright-test": {
"command": "npx",
"args": ["playwright", "run-test-mcp-server"]
}
}
}
```
**To disable**: Set `tea_use_mcp_enhancements: false` in `.bmad/bmm/config.yaml` OR remove MCPs from IDE config.
| Command | Workflow README | Primary Outputs | Notes | With Playwright MCP Enhancements |
| -------------- | ------------------------------------------------- | --------------------------------------------------------------------------------------------- | ---------------------------------------------------- | ------------------------------------------------------------------------------------------------------------ |
| `*framework` | [📖](../workflows/testarch/framework/README.md) | Playwright/Cypress scaffold, `.env.example`, `.nvmrc`, sample specs | Use when no production-ready harness exists | - |
| `*ci` | [📖](../workflows/testarch/ci/README.md) | CI workflow, selective test scripts, secrets checklist | Platform-aware (GitHub Actions default) | - |
| `*test-design` | [📖](../workflows/testarch/test-design/README.md) | Combined risk assessment, mitigation plan, and coverage strategy | Risk scoring + optional exploratory mode | **+ Exploratory**: Interactive UI discovery with browser automation (uncover actual functionality) |
| `*atdd` | [📖](../workflows/testarch/atdd/README.md) | Failing acceptance tests + implementation checklist | TDD red phase + optional recording mode | **+ Recording**: AI generation verified with live browser (accurate selectors from real DOM) |
| `*automate` | [📖](../workflows/testarch/automate/README.md) | Prioritized specs, fixtures, README/script updates, DoD summary | Optional healing/recording, avoid duplicate coverage | **+ Healing**: Pattern fixes enhanced with visual debugging + **+ Recording**: AI verified with live browser |
| `*test-review` | [📖](../workflows/testarch/test-review/README.md) | Test quality review report with 0-100 score, violations, fixes | Reviews tests against knowledge base patterns | - |
| `*nfr-assess` | [📖](../workflows/testarch/nfr-assess/README.md) | NFR assessment report with actions | Focus on security/performance/reliability | - |
| `*trace` | [📖](../workflows/testarch/trace/README.md) | Phase 1: Coverage matrix, recommendations. Phase 2: Gate decision (PASS/CONCERNS/FAIL/WAIVED) | Two-phase workflow: traceability + gate decision | - |
**📖** = Click to view detailed workflow documentation