# Validation Report **Document:** c:/laragon/www/LMS-BGN/docs/epic-2-context.md **Checklist:** c:/laragon/www/LMS-BGN/.bmad/bmm/workflows/4-implementation/epic-tech-context/checklist.md **Date:** 2025-11-12 ## Summary - Overall: 1/11 passed (9%) - Partial: 9/11 - Fail: 1/11 ## Section Results ### Tech Spec Checklist Pass Rate: 1/11 (9%) ⚠ PARTIAL Overview clearly ties to PRD goals Evidence: Fokus pada konteks teknis (lines 2–5) tanpa menyebutkan tujuan PRD eksplisit; keterkaitan implisit melalui rujukan komponen UI (lines 41–47). ⚠ PARTIAL Scope explicitly lists in-scope and out-of-scope Evidence: "## Lingkup Teknis" (lines 9–15) menjelaskan in-scope; out-of-scope tidak dijabarkan eksplisit selain status non-implementasi. ⚠ PARTIAL Design lists all services/modules with responsibilities Evidence: Model Konseptual (lines 17–25) menguraikan entitas, tetapi tidak memetakan tanggung jawab modul/servis. ⚠ PARTIAL Data models include entities, fields, and relationships Evidence: Outline data (lines 17–25) ada; relasi tidak dijelaskan rinci. ⚠ PARTIAL APIs/interfaces are specified with methods and schemas Evidence: Area API (lines 27–31) mencantumkan endpoint; tidak ada skema/method detail. ⚠ PARTIAL NFRs: performance, security, reliability, observability addressed Evidence: Acceptance Gates (lines 33–36) memuat akses kontrol, throttling/logging; performa, reliability, observability tidak eksplisit. ⚠ PARTIAL Dependencies/integrations enumerated with versions where known Evidence: Dependencies (lines 37–39) menyebut bank soal & integrasi PDF tanpa versi. ⚠ PARTIAL Acceptance criteria are atomic and testable Evidence: Acceptance Gates (lines 33–36) adalah kondisi persetujuan, belum AC atomik/testable per fitur. ✗ FAIL Traceability maps AC → Spec → Components → Tests Evidence: Tidak ada matriks traceability. ✓ PASS Risks/assumptions/questions listed with mitigation/next steps Evidence: "## Risiko & Mitigasi" (lines 40–42) memuat risiko dan mitigasi. ⚠ PARTIAL Test strategy covers all ACs and critical paths Evidence: Tidak ada strategi pengujian terpetakan ke seluruh AC dan jalur kritis. ## Failed Items - Traceability maps AC → Spec → Components → Tests Recommendation: Tambahkan matriks traceability AC → Spec → Components → Tests. ## Partial Items - Tambahkan out-of-scope eksplisit. - Lengkapi tanggung jawab modul/servis. - Detailkan relasi data (ERD/teks). - Spesifikasikan skema/method API. - Tambahkan NFR performa, reliability, observability. - Cantumkan versi dependency/integrasi. - Susun AC yang atomik/testable per fitur. - Peta test strategy ke AC dan jalur kritis. ## Recommendations 1. Must Fix: - Matriks traceability AC → Spec → Components → Tests. 2. Should Improve: - Out-of-scope eksplisit; detail data/API; NFR lengkap; versi dependency. 3. Consider: - Tautkan eksplisit ke tujuan PRD di Overview untuk memperkuat konteks.