LMS-BGN/docs/validation-report-epic-1-co...

69 lines
3.3 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Validation Report
**Document:** c:/laragon/www/LMS-BGN/docs/epic-1-context.md
**Checklist:** c:/laragon/www/LMS-BGN/.bmad/bmm/workflows/4-implementation/epic-tech-context/checklist.md
**Date:** 2025-11-12
## Summary
- Overall: 2/11 passed (18%)
- Partial: 8/11
- Fail: 1/11
## Section Results
### Tech Spec Checklist
Pass Rate: 2/11 (18%)
⚠ PARTIAL Overview clearly ties to PRD goals
Evidence: Dokumen fokus pada konteks teknis (lines 25) tanpa menyebutkan tujuan PRD secara eksplisit; keterkaitan implisit melalui rujukan frontend di bagian Contract Principle (lines 3946).
✓ PASS Scope explicitly lists in-scope and out-of-scope
Evidence: "## Lingkup Teknis" (lines 915) memuat in-scope; out-of-scope dinyatakan eksplisit: "Tanpa perubahan UI/DB produksi (non-implementasi)" (line 15).
⚠ PARTIAL Design lists all services/modules with responsibilities
Evidence: Area API (lines 2733) dan Model Konseptual (lines 1725) mengindikasikan layanan & entitas namun belum menjabarkan tanggung jawab tiap modul/servis.
⚠ PARTIAL Data models include entities, fields, and relationships
Evidence: Model Konseptual (lines 1725) mencantumkan entitas dan fields; relasi disebut implisit di Dependencies (lines 3738) namun belum ada pemetaan hubungan lengkap.
⚠ PARTIAL APIs/interfaces are specified with methods and schemas
Evidence: Area API (lines 2733) mencantumkan endpoint namun belum ada skema/method detail.
⚠ PARTIAL NFRs: performance, security, reliability, observability addressed
Evidence: Acceptance Gates (lines 3436) menyebut privacy, rate limiting, akses kontrol; performa, reliability, observability belum dibahas eksplisit.
⚠ PARTIAL Dependencies/integrations enumerated with versions where known
Evidence: Dependencies (lines 3738) mencantumkan sinkronisasi data & konsistensi relasi tanpa versi.
⚠ PARTIAL Acceptance criteria are atomic and testable
Evidence: Acceptance Gates (lines 3436) adalah kondisi persetujuan, belum AC atomik/testable per fitur.
✗ FAIL Traceability maps AC → Spec → Components → Tests
Evidence: Tidak ada matriks traceability yang mengaitkan AC ke spesifikasi, komponen, dan tes.
✓ PASS Risks/assumptions/questions listed with mitigation/next steps
Evidence: "## Risiko & Mitigasi" (lines 4043) memuat risiko dan mitigasi.
⚠ PARTIAL Test strategy covers all ACs and critical paths
Evidence: Tidak ada strategi pengujian per AC; hanya menyiratkan kontrak dan prinsip; perlu pemetaan jalur kritis.
## Failed Items
- Traceability maps AC → Spec → Components → Tests
Recommendation: Tambahkan matriks traceability yang menghubungkan setiap AC ke bagian spesifikasi, komponen (file/kelas), dan kasus uji.
## Partial Items
- Lengkapi desain layanan/modul dengan tanggung jawab.
- Tambahkan pemetaan relasi antar entitas (ERD singkat).
- Spesifikasikan skema/method API.
- Tambahkan NFR performa, reliability, observability.
- Cantumkan versi dependency/integrasi.
- Uraikan AC yang atomik dan testable per fitur.
- Susun test strategy yang memetakan AC dan jalur kritis.
## Recommendations
1. Must Fix:
- Matriks traceability AC → Spec → Components → Tests.
2. Should Improve:
- Tambah ERD/relasi; perluas spesifikasi API; NFR lengkap; versi dependency.
3. Consider:
- Tautkan eksplisit ke tujuan PRD di Overview untuk menguatkan konteks.