2.1 KiB
2.1 KiB
Rencana Sprint — LMS MBG (Nov–Dec)
Sprint 1 (Nov W1–W2) — Pondasi Belajar
- Goals:
- Katalog & detail kursus, modul/lesson viewer, progres dasar.
- Kuis dasar pada demo interaktif.
- Scope:
- Course list/detail,
ModuleTabs,ModuleNavigation, progres state. - Integrasi awal assignments/schedule (read-only jika perlu).
- Course list/detail,
- Deliverables:
- Learner: alur enroll → belajar → progres bertambah.
- Admin: melihat ringkas kelas & peserta.
- DOR/DOD:
- DOR: desain minimal, konten awal tersedia.
- DOD: lint/typecheck bersih; alur tanpa blocker; dokumentasi singkat.
Sprint 2 (Nov W3–W4) — Assessment & Sertifikasi
- Goals:
- Sesi ujian, ringkasan hasil, sertifikat PDF & kirim ulang email.
- Scope:
exam-sessionpages, summary, admin/exams CRUD minimal.CertificatePDF& detail sertifikat admin.
- Deliverables:
- Ujian berjalan, sertifikat dihasilkan & diunduh, kirim ulang berfungsi.
- DOR/DOD:
- DOR: bank soal contoh, aturan kelulusan jelas.
- DOD: passing path lengkap, tanpa error di browser & terminal.
Sprint 3 (Dec W1–W2) — Analytics & Reward (Phase-1)
- Goals:
- Dasbor analytics, export sederhana, reward jam belajar non-transaksional.
- Scope:
admin/analyticsdasar, export CSV, reward dashboard flagged.
- Deliverables:
- Admin mendapatkan metrik inti; reward tampil untuk demo internal.
- DOR/DOD:
- DOR: definisi metrik; mapping progres → jam belajar.
- DOD: verifikasi data sample; lint/typecheck bersih.
Sprint 4 (Dec W3–W4) — Desktop & UAT
- Goals:
- Desktop UX polishing, kinerja, QA/UAT, rilis RC.
- Scope:
- Polishing UX di seluruh learner flow desktop; audit performa; perbaikan.
- Deliverables:
- Build stabil; laporan UAT; panduan singkat penggunaan.
- DOR/DOD:
- DOR: test plan siap; perangkat uji desktop tersedia.
- DOD: semua acceptance terpenuhi; tidak ada blocker.
RACI Ringkas
- FE1: learner flow, viewer, desktop UX polishing.
- FE2: assessment, sertifikat, analytics/reward.
- QA: test plan, UAT eksekusi, regresi.
- PM/Content: scope, konten, prioritas, acceptance.