LMS-BGN/docs/retrospectives/validation-report-epic-2-re...

68 lines
3.0 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Validation Report
**Document:** c:/laragon/www/LMS-BGN/docs/retrospectives/epic-2-retrospective-2025-11-12.md
**Checklist:** c:/laragon/www/LMS-BGN/.bmad/bmm/workflows/4-implementation/epic-tech-context/checklist.md
**Date:** 2025-11-12
## Summary
- Overall: 2/11 passed (18%)
- Partial: 7/11
- Fail: 1/11
- N/A: 1/11
## Section Results
### Tech Spec Checklist
Pass Rate: 2/11 (18%)
⚠ PARTIAL Overview clearly ties to PRD goals
Evidence: Ringkasan (lines 712) menautkan ke OpenAPI dan kebutuhan UI, tidak menyebut PRD eksplisit.
✓ PASS Scope explicitly lists in-scope and out-of-scope
Evidence: "## Cakupan yang Diimplementasikan" (lines 1422) dan "## Tindak Lanjut (Tanpa Implementasi Langsung)" (lines 5461) memisahkan apa yang sudah diimplementasikan vs belum.
⚠ PARTIAL Design lists all services/modules with responsibilities
Evidence: Dokumen fokus pada endpoint dan hasil; desain modul/servis dan tanggung jawab tidak lengkap.
N/A Data models include entities, fields, and relationships
Reason: Retrospektif tidak bertujuan mendeskripsikan model data; referensi skema ada di OpenAPI.
⚠ PARTIAL APIs/interfaces are specified with methods and schemas
Evidence: Endpoint disebut (lines 1422) namun skema/method detail ada di OpenAPI; tidak diulang di dokumen.
⚠ PARTIAL NFRs: performance, security, reliability, observability addressed
Evidence: "## Kualitas & Metrik" (lines 2936) dan "## Risiko & Mitigasi" (lines 4653) menyentuh kualitas, auth, rate-limit; reliability/observability disebut sebagai tindak lanjut (lines 5861).
⚠ PARTIAL Dependencies/integrations enumerated with versions where known
Evidence: Integrasi SMTP/QA disebut implisit; tidak ada daftar dependency versi.
⚠ PARTIAL Acceptance criteria are atomic and testable
Evidence: Menyebut suite test lulus (lines 2932) namun tidak memetakan AC atomik/testable.
✗ FAIL Traceability maps AC → Spec → Components → Tests
Evidence: Tidak ada matriks traceability.
✓ PASS Risks/assumptions/questions listed with mitigation/next steps
Evidence: "## Risiko & Mitigasi" (lines 4653) jelas dengan mitigasi.
⚠ PARTIAL Test strategy covers all ACs and critical paths
Evidence: Ada hasil test dan rekomendasi CI, namun tidak ada pemetaan ke AC dan jalur kritis.
## Failed Items
- Traceability maps AC → Spec → Components → Tests
Recommendation: Tambahkan matriks traceability AC → Spec → Components → Tests.
## Partial Items
- Perkuat keterkaitan ke PRD di Overview.
- Tambahkan ringkasan NFR reliability/observability yang lebih eksplisit.
- Daftar dependency/integrasi dengan versi yang diketahui.
- Susun AC atomik/testable dan pemetaan ke hasil test.
- Tambahkan highlight jalur kritis dan cakupan test terkait.
## Recommendations
1. Must Fix:
- Matriks traceability AC → Spec → Components → Tests.
2. Should Improve:
- NFR reliability/observability ringkas; dependency versi; AC atomik; pemetaan test.
3. Consider:
- Tautan eksplisit ke tujuan PRD agar benang merah kuat.