LMS-BGN/docs/validation-report-epic-2-co...

2.9 KiB
Raw Permalink Blame History

Validation Report

Document: c:/laragon/www/LMS-BGN/docs/epic-2-context.md Checklist: c:/laragon/www/LMS-BGN/.bmad/bmm/workflows/4-implementation/epic-tech-context/checklist.md Date: 2025-11-12

Summary

  • Overall: 1/11 passed (9%)
  • Partial: 9/11
  • Fail: 1/11

Section Results

Tech Spec Checklist

Pass Rate: 1/11 (9%)

⚠ PARTIAL Overview clearly ties to PRD goals Evidence: Fokus pada konteks teknis (lines 25) tanpa menyebutkan tujuan PRD eksplisit; keterkaitan implisit melalui rujukan komponen UI (lines 4147).

⚠ PARTIAL Scope explicitly lists in-scope and out-of-scope Evidence: "## Lingkup Teknis" (lines 915) menjelaskan in-scope; out-of-scope tidak dijabarkan eksplisit selain status non-implementasi.

⚠ PARTIAL Design lists all services/modules with responsibilities Evidence: Model Konseptual (lines 1725) menguraikan entitas, tetapi tidak memetakan tanggung jawab modul/servis.

⚠ PARTIAL Data models include entities, fields, and relationships Evidence: Outline data (lines 1725) ada; relasi tidak dijelaskan rinci.

⚠ PARTIAL APIs/interfaces are specified with methods and schemas Evidence: Area API (lines 2731) mencantumkan endpoint; tidak ada skema/method detail.

⚠ PARTIAL NFRs: performance, security, reliability, observability addressed Evidence: Acceptance Gates (lines 3336) memuat akses kontrol, throttling/logging; performa, reliability, observability tidak eksplisit.

⚠ PARTIAL Dependencies/integrations enumerated with versions where known Evidence: Dependencies (lines 3739) menyebut bank soal & integrasi PDF tanpa versi.

⚠ PARTIAL Acceptance criteria are atomic and testable Evidence: Acceptance Gates (lines 3336) adalah kondisi persetujuan, belum AC atomik/testable per fitur.

✗ FAIL Traceability maps AC → Spec → Components → Tests Evidence: Tidak ada matriks traceability.

✓ PASS Risks/assumptions/questions listed with mitigation/next steps Evidence: "## Risiko & Mitigasi" (lines 4042) memuat risiko dan mitigasi.

⚠ PARTIAL Test strategy covers all ACs and critical paths Evidence: Tidak ada strategi pengujian terpetakan ke seluruh AC dan jalur kritis.

Failed Items

  • Traceability maps AC → Spec → Components → Tests Recommendation: Tambahkan matriks traceability AC → Spec → Components → Tests.

Partial Items

  • Tambahkan out-of-scope eksplisit.
  • Lengkapi tanggung jawab modul/servis.
  • Detailkan relasi data (ERD/teks).
  • Spesifikasikan skema/method API.
  • Tambahkan NFR performa, reliability, observability.
  • Cantumkan versi dependency/integrasi.
  • Susun AC yang atomik/testable per fitur.
  • Peta test strategy ke AC dan jalur kritis.

Recommendations

  1. Must Fix:
    • Matriks traceability AC → Spec → Components → Tests.
  2. Should Improve:
    • Out-of-scope eksplisit; detail data/API; NFR lengkap; versi dependency.
  3. Consider:
    • Tautkan eksplisit ke tujuan PRD di Overview untuk memperkuat konteks.